General contractor · Commercial fit-out · Manhattan · October 2026
Full-floor office fit-out, Flatiron District — The Restoration Guide (design-build, Chicago)
Subcontractor to The Restoration Guide for the painting, flooring and HVAC ductwork packages on a 17th-floor corporate headquarters at 20 West 22nd Street: elevator lobby and entry hall, reception, conference rooms, executive offices, open plan, town hall, wellness room, coffee bar and IT room.
Scope. Brought in early October with the floor at bare slab and a fixed turnover date. Reworked the supply ductwork above the new drywall ceilings, added transfer ducts and grilles, resized registers to the new room layouts and tied new runs into the existing mains, all to the mechanical engineer's drawings and the architect's reflected ceiling plan. Painted the entire floor: walls, drywall ceilings, soffits and trim, plus the exposed structure, ductwork and registers where the open ceiling and grid were kept. Installed carpet tile with a contrasting walk path, luxury vinyl tile in the town hall and rubber base throughout, as each delivery arrived.
Outcome. On the floor within two days of the first site walk; the front ductwork finished on day one so the ceilings could close on schedule. Painting completed on schedule, every flooring area with material on site finished, ductwork installed to the engineer's and architect's spec. When the electrical schedule tightened, we brought in an electrician so the ceiling work did not stall. Crews worked two weekends to hold the turnover date.
During: ceilings and exposed structure airless-sprayed, glazing and partitions masked. After: ductwork, register and soffit finished and painted to match. After: furniture arriving on the finished floor.