Saw-Cut and Pour-Back Slab Work, Finished Flush With the Floor

Usually replies in about a minute

New plumbing in a retail, restaurant or office fit-out usually means cutting the slab. We saw-cut concrete floor slabs for plumbing and electrical trenches and for new openings, and we infill slab openings left behind after demolition. Then we pour the concrete back flush and level with the existing floor: dowels or rebar set into the existing slab, the mix placed and finished so the flooring can go down over it. We work as a subcontractor to general contractors across Manhattan, the Bronx, Queens, Staten Island and Westchester.

What we cut and fill

Trenches for new sanitary, waste and supply lines in retail, restaurant and office fit-outs. Cuts for new floor drains and relocated fixtures. Trenches for electrical conduit run below the floor. Slab openings left after demolition, such as abandoned shafts, chases and old penetrations, infilled to match the surrounding floor. Infills worked from both sides of the slab, the floor above and the ceiling below, when the opening calls for it.

How a pour-back is done

The cut lines are laid out and saw-cut straight, and the concrete between them is broken out and removed from the floor. Once the plumbing or electrical work in the trench is in and approved, the trench or opening is prepared: dowels or rebar are drilled into the existing slab, and the concrete mix is placed, consolidated and finished flush and level with the floor around it. When the structural engineer or the drawings give a detail for the infill, we build to that detail.

Ready to get started?

Get a Slab Work Estimate

Recent work

In November 2026 we completed slab infills in a Manhattan commercial building for a general contractor: floor and ceiling-side infills on one floor and a floor infill on the floor above, each finished flush with the existing slab.

Working around your schedule

Slab work sits between trades. The cut comes before the rough plumbing, and the pour-back has to be done before the floor goes down. We schedule the cut and the pour around your plumber's rough-in and inspection, protect the work area and clean up at the end of each day. The estimate states how many working days the work takes.

Ready to get started?

Get a Slab Work Estimate

For general contractors

Send the drawings or a marked-up plan showing the trench runs and openings, and we come back with a line-item estimate. Our W-9 and certificate of insurance come with every proposal. We also take on the finish trades that follow the slab work: painting, drywall and taping, doors and hardware, and millwork. Call or text (914) 372-0519, or use the form below.

Frequently asked questions

Do you do the plumbing too?

No. We cut the slab and pour it back. The plumbing is installed by your licensed plumber, and we schedule the cut and the pour around their rough-in.

Do you follow the structural engineer's details?

Yes. When the engineer or the drawings give a detail for the infill, such as the dowels, the rebar or the mix, we build to that detail. When there is no detail for an opening, we raise it with you before we pour.

Will the patch be level with the existing floor?

Yes. The pour-back is finished flush and level with the existing slab around it, so the flooring can go down over it.

What do you need to give an estimate?

The drawings or a marked-up plan showing each trench and opening with its length and width, the slab thickness if you know it, and the floor the work is on. Photos of the existing floor help. You get a line-item estimate back.

Get a Slab Work Estimate

Get a free, no-obligation estimate for your concrete saw-cut & pour-backproject. We'll get back to you within 24 hours.